The lower roof decking is largely complete on the north side and work began on the south lower roof. Installation of the ceiling underneath the lower roofs was also initiated.
Craig brought the material for the lower roof ceilings.
This was stacked inside the car.
The crew started installation.
Another view. The outer boards were put up first.
The chop saw was brought into the car to save some steps.
A nail gun is better than hammering upside down! Most of the north side was done by the end of August.
The new upper roof carlines have been installed.
We welcomed Dean back for a visit after a horrible accident last spring. It was wonderful to see him standing on two healing legs. He and Craig are looking at the carlines for the platform roofs. They are cut at different angles in cross section to create the sloping curves of the roof.
This photos shows how some of the carlines are angled. Most could be reused.
Carlines are being installed in the platform roof.
This photo shows the platform roof with the carlines in place.
This is a view from below.
Thanks to Don Atkinson for some of the photos.