Friends COS calendar
A subset of the Friends of the Cumbres and Toltec Scenic Railroad located in Colorado Springs, Colorado, with the mission of preservation, restoration, and interpretation of CTSRR historic assets. The Springs group is primarily involved in restoration. See below for blog archive of older postings.
Sunday, December 6, 2009
Meanwhile.......11/21/09
A Good Day
Monday, October 26, 2009
Got Piles?
Piledriver OB put on several demonstrations at the Colorado Railroad Museum in Golden, CO, on two weekends recently. On October 10-11 and 17-18, again assisted by locomotive 346 and Museum personnel, OB was put through her paces. Some metalwork was done by the museum to the weight guide near the lower part of the mast where the weight had been binding. The donkey engine behaved fairly well, although will require some attention to keep it operating smoothly. Otherwise, there were no glitches, except for near frostbite to operators on the first weekend.

Above, left, OB comes to the worksite behind 346. The Golden Museum is building a portion of a trestle using the same techniques as was used during the time of this equipment. We will drive the pilings for this trestle, and Museum volunteers will complete it at a later time. After some switching to get 346 behind OB, and attaching steam lines, etc. she is ready to operate. First we raise the mast, above right. Points have been cut on the pilings to facilitate driving.
The mast braces are secured by the efficient ground crew, and we are ready to proceed.
The mast raising cable is disconnected from its drum on the donkey engine, and the lifting cable is attached instead. A pile is hooked to the cable, and raised into position for driving into the ground.
Above, left, OB comes to the worksite behind 346. The Golden Museum is building a portion of a trestle using the same techniques as was used during the time of this equipment. We will drive the pilings for this trestle, and Museum volunteers will complete it at a later time. After some switching to get 346 behind OB, and attaching steam lines, etc. she is ready to operate. First we raise the mast, above right. Points have been cut on the pilings to facilitate driving.
The mast braces are secured by the efficient ground crew, and we are ready to proceed.
The mast raising cable is disconnected from its drum on the donkey engine, and the lifting cable is attached instead. A pile is hooked to the cable, and raised into position for driving into the ground.
The locomotive has moved OB forward to the end of the track where the trestle is being built. After careful alignment of the piling, the weight is raised approximately 1-1/2 feet and allowed to drop. If it is raised too high, the pilings tend to split. Some guidance with straps, etc. is required to keep the piles straight.
At the end of the day (actually 4 days), below, right, we had set four pilings for the trestle, plus a practice one further back along the track. John is getting the rhythm down, and it is quite an experience to see and hear the operation of OB.
Thanks to Glenn Hall for help with the photos.
Thanks to Glenn Hall for help with the photos.
Sunday, September 20, 2009
OB Got Steam?!! 09-17-09
We are at the Colorado Railroad Museum in Golden, Colorado with Piledriver OB attached to their beautiful old 346 steam locomotive. This is to be the second time for a successful raising of the mast and smashing of a watermelon. OB is at the front of a maintenance of way train put together by the Museum, and was planned as a learning oportunity for the crew as well as a demonstration in conjunction with the Narrow Gauge Convention.
Thursday, September 10, 2009
OB timeout Thurs. 9-10-09
Time out to install the new truss rod on OB at the Colorado Railroad Museum in Golden.
We picked up the new hardware this morning, and were fortunate to have help from one of the Museum guys with a backhoe to help raise and position the rod. Right above, inside the cab the pieces came close enough to engage the turnbuckle. Left middle, we had to do the reciprocating saw thing again to get things to line up with the plate on top of the corner post. Right middle, after securing the forward plate to the deck (pardon the nautical terms), and tightening the turnbuckles, the rear plate was easily pulled into place and the bolt straightened and the nuts tightened. The lower two photos show the (straight) rod now in place, before and after painting. She is structurally sound again, ready for steam. More cosmetic work to come.
Tuesday, September 8, 2009
Woodshop
Subscribe to:
Posts (Atom)