The last work session in October saw the floor framing on the left, above that has been cleaned and treated with linseed oil. Note the door frame with the finished post on the right that is lacking on the left. Craig has made replacements shown on the right, above, since most were not usable.
The next photo shows the new sill that has been marked for the mortises. The vertical framing members next to it have tenons on the lower end that engage the sill. There also are mortise and tenon joints on the inside of the sill with the cross-framing, so the replacement process will be "interesting."
The next photo shows Craig drilling the mortise, and finally in the last photo, chiseling the final shape. This will have to be done many times over.